BSI IST/5/-/15 (Posix) Posix Panel Activity Report 29 August 1995 There has been no meeting activity relating to IST/5/-/15 since the last IST/5 meeting on 6-June. 1. ISO Business, Recommended Votes, etc: . CD 14515-1: POSIX - Test Methods for Measuring Conformance to POSIX, Part 1: System Interfaces. Concurrent CD registration and CD ballot closed 18-July-1995. The panel recommended a YES vote, with comments: "The standard forming the foundation for this work, ISO/IEC 9945-1:1990 is five years old and is in the process of being amended; the IEEE standard from which this work is derived was published in 1992. "The UK would recommend that this work, CD 14515-1, be progressed as it stands, unchanged, to reinforce current industry standards and practice. The UK would recommend that the following points be forwarded to the US development body for consideration at the next revision of the 2003.1 work: ". Improve unspecific wording, eg: 1.4.7.2 Recommendations: (lines 434 - 437) ...PCTS.1 should not rely solely on the return value from that compiler or translator , but should also examine any messages produced during test execution. For what? As it stands this is a no-op; some action should also be suggested/recommended/ required. "1.4.12.1.1 Requirements: ...the signal handling routine behaves correctly... What does this mean? Shall abort? Shall behave as specified by the appropriate definition? Shall ignore the call? "1.4.16.1 Requirements: The PCTS.1 shall supply all files... Do not create them on the target system with the file creating utility. Does this mean exactly what it says, or should it also deny use of all file creation techniques available on the target system? "Table 2-1 Typographical Conventions: While is a valid example of the lexography of an 'include' file in a C program source, it is not a "C language header" ".2 Process Termination: atexit() is defined in the ISO C standard (Section 7.10.4.2). The wording at lines 653 and 698 should be revised to reflect this." . ISO/IEC 9945-1 Amd 2: POSIX - Part 1: System API [C language] Amendment 2: Threads Extension. DAM ballot closes 4-September-1995. The panel recommends a YES vote. 2. Proposed Delegation for WG15, 23-27 October: The proposed UK delegation for the WG15 meeting in Florida is expected to be: David Cannon (University of Exeter) Martin Kirk (X/Open) IST/5/-/15 meets on the 8-September; the final list of delegates will be confirmed then. IST/5/-/15 requests that it be permitted to submit this final list to the IST/5 secretariat for notification to the WG15 Convener shortly after that date. 3. Future Meetings: 1995: 8 September IST/5/-/15 X/Open, Reading 15-20 October IEEE Posix groups St Petersburg, Fl 23-27 October ISO JTC-1/SC22/WG15 Florida, USA 24 November IST/5/-/15 NFA 12 December IST/5 BSI, London 1996: 7-12 January IEEE Posix groups Albuquerque, Nm 20-24 May ISO JTC-1/SC22/WG15 Denmark 14-19 April IEEE Posix groups Savannah, Ga 14-19 July IEEE Posix groups Jackson Hole, Wy October ISO JTC-1/SC22/WG15 Munich, Germany 13-18 October IEEE Posix groups Munich, De David Cannon 28-August-1995