JTC1/SC22/WG15 - RCT N066 Date: May 10, 1995 Supersedes: N/A Title/Topic: Meeting Minutes for University of Twente, Enschede, The Netherlands May 10, 1995 Source: Secretary RGCT Action Requested(check one): _____Review/Comment by: _____Respond by: _____For discussion/consideration @ RGCT meeting _____For distribution __X__For information _____Other(see details) Details: JTC1/SC22/WG15 - RCT N066 May 10, 1995 MEETING MINUTES JTC1/SC22/WG15 Rapporteur Group on Conformance Testing May 10, 1995 University of Twente, Enchede, The Netherlands 1.0 Opening of Meeting 1.1 Welcome, Introductions, and Roll Call The meeting was opened by Jerry Powell at 1600 on May 10. 1995. Jerry Powell, Lowell Johnson (USA) Patric Dempster (Canada) David Cannon (UK) 1.2 Selection of recording secretary Jerry Powell volunteered to take the minutes. 1.3 Selection of drafting committee It was decided that such a small committee could effectively use the whole committee for drafting. 1.4 Adoption of agenda The agenda was approved without change. 1.5 Approval of minutes The minutes from the last meeting in Whistler, British Columbia were approved. 2.0 Reports on CT Activities SD003 shows Conformance Testing status. 3.0 Conformance Testing Experts - Presentations There were no expert presentations. 4.0 Status, Liaison, and Action Item Reports 4.1 SC22/WG15 Action Items WG15 ACTION 9505-09 Review and comment on WG15 Document number N575. 1. Review and Comment on EWOS Technical Guide on Open System Environment Conformance Testing To be discussed at an RGCT meeting scheduled for July 11, 1995 and via email if EWOS provides the document on time, else it will be handled via email. 2. Review and comment on EWOS Technical Guide on Conformance Testing Vocabulary To be discussed at RGCT meeting scheduled for July 11, 1995 and via email if EWOS provides the document on time, else it will be handled via email. 3. Identify other sources of POSIX testing terminology and definitions No other sources were identified. RGCT requests that WG15 RIN evaluate the completeness and accuracy of the EWOS/EGCT documents. 4. Identify WG15 representative to attend EWOS/EGCT June 27, 1995 and present CT status James de Raeve of X/Open has been identified to present this information with the assistance of Jerry Powell. 5.0 New Business 5.1 Canada is concerned that the 2003 draft standard is not complete enough to meet the needs of Conformance Assessment laboratories. 5.2 Discussed the termination of the RGCT. It was decided that Test Method status of PASC activities is presented to WG15 via the SD11 and ConvenerŐs reports and there was no need to duplicate this effort. It was agreed that the action items assigned of late could just as easily been given to the US and allow the PASC Test Methods groups to provide input. The RGCT has not been providing any value add. Based on this discussion it was decided to present a resolution to the WG15 requesting that the RGCT be terminated or refocus the group to work on something that the WG15 deems will provide value add. 6.0 Review/Approval of RGCT Action Items 9310-01 CLOSED - Jerry Powell to get copies of the ISO procedures for defect management and interpretation. Jerry Powell to send out the information gathered to the mailing list for review and comment at the next meeting. 9410-01 CLOSED - Roger Martin to gather information about the mission and activities of JTC1 SWGCA. Overcome by events. 9505-01 OPEN - Canada to review the latest 2003 draft to determine the completeness of the draft standard to meet the needs of conformance assessment bodies . 7.0 Review/Approval of RGCT Resolutions 9505-01 The RGCT believes it has completed its assigned work items and invites WG15 to terminate the rapporteur group, or if WG15 believes there is useful work to be done in Applications Conformance Testing WG15 is invited to redraft the RGCT Terms of Reference. 8.0 Closing Process 8.1 Document Number Assignment N066 - Minutes from the Twente meeting. N067 - Agenda for the next RGCT meeting. 8.2 Future Meeting Considerations Based on getting the EWOS EGCT documents a meeting will be held with the PASC Test Methods group on July 11, 1995 at Nashua, NH to discuss these. Electronic discussion will take place so that RGCT status in October will reflect the results of the review. 8.3 Prepare Rapporteur Report (WG15 Action Item 9305-58) o Forward SD003 showing Conformance Status o RGCT requests that WG15 RIN reviews the EWOS/EGCT documents listed in WG15 N575 for accuracy. o RGCT recommends that WG15 terminate the rapporteur group. 8.4 Thanks to Host The RGCT wishes to thank the University of Twente for sponsoring this meeting. 8.5 Adjourn Adjourned May 10, 1995 at 17:30.